 |
Mapleton Local Schools Approves House Bill 264 Project
Posted on 6/12/2012
Mapleton Local Schools recently contracted with CCG to implement an Energy Conservation Program under the guidelines of House Bill 264 to address several issues in several buildings, all of which are owned and operated by the district. The buildings include the High School/Middle School complex which consists of a High School wing, Middle School wing, and Board of Education office.
Lighting Upgrades will be made in the High School, Middle School and Elementary. Included are fixture replacements in high energy consumption areas such as the Gymnasiums, Cafeteria, Vo-Ag shops, and Libraries.
Building Automation Improvements include the upgrade of controls in the High School and Middle School, installation of Automated Logic Controls in that complex, and an upgrade of the existing Automated Logic Controls system in the Elementary school. Upon completion there will be a single web-based automation system controlling the affected buildings. The District plans to utilize several resources to track the performance of the project on an on-going basis.
The program will realize annual savings of $29,409 in electric costs and $22,529 in gas costs. Annual operational savings are $5,833, or 10% of total savings. Total savings for the project, over the 15-year term, is estimated at $861,795.
|
Company News
Akron Children's Hospital Considine Building Win Energy Award
It is fitting that last week, on Energy Efficiency Day, the
American Society for Health Care Engineers announced that
Akron Children’s Hospital has won an Energy to Care Gold
Standard Award for the continued energy reduction work in
the Considine Professional Building.
Energy Project of the Year
CCG was recognized by Association of Energy Engineers.
Leetonia Exempted Village School See Big Reduction in Energy
Check out the message we just received from Leetonia
Exempted Village Schools!
CCG Automation Completes Campus Wide Metering Project at Akron Childrens Hospital
CCG Automation recently completed a campus-wide metering
project at Akron Children's Hospital to help track energy
usage throughout the campus.
CCG Automation Completes Lighting Upgrades at James A. Garfield Local Schools
CCG Automation recently completed lighting upgrades at the
High School/Middle School in the James A. Garfield Local
School District, located in Garrettsville, OH.
Mechanical Upgrades at St. John Bosco Church
CCG recently completed mechanical upgrades at St. John Bosco
Church in Parma Heights, Ohio to address comfort and energy
consumption
» View Archived News
|
 |