Keystone High School, Keystone Local Schools

As part of their new construction, CCG Automation, Inc. installed an Automated Logic Corporation® WebCTRL© building automation system to control all major pieces of HVAC equipment as well as monitoring humidity and CO2 levels.

Project Highlights:

  • Keystone High School is an Energy Star Certified Building.
  • Maintenance costs were lowered and equipment life extended due to reduced equipment runtime and more efficient equipment operation.
  • The 47,000 btu/ft2/year energy consumption is 45% below the Ohio average of 86,000 btu/ft2/year for K-12 schools with Variable Air Volume systems.
  • Classrooms held to within an average of 1/10th of one degree of setpoint.

Success Points:

Cost/ft2
Current            $.94
Baseline          N/A

Energy Cost/Year
Current            $109,448
Baseline          N/A

Energy Star™ Rating
Current            78
Baseline          N/A

Btu/Ft ²/Year
Current            47,000
Baseline          N/A

Annual Savings        $59,713

Over the life of the building, Keystone Local Schools will save more than $22.4 million* in utility costs.   *Based on Ohio K-12 schools average.

Building Facts:

  • Type of HVAC System: Variable Air Volume
  • Year Built: 2006
  • Square Footage: 116,663

 

Energy Star Compliant

 

Project Images



No Images Found.

» Return to Success Stories

Company News

Energy Project of the Year
CCG was recognized by Association of Energy Engineers

Leetonia Exempted Village School See Big Reduction in Energy
Check out the message we just received from Leetonia Exempted Village Schools!

Mechanical Upgrades at St. John Bosco Church


CCG Automation Completes Campus Wide Metering Project at Akron Childrens Hospital


CCG Automation Completes Lighting Upgrades at James A. Garfield Local Schools


Olmsted Falls Middle School Completes Control Upgrades


» View Archived News