Strasburg-Franklin K-12 School, Strasburg-Franklin Local Schools

The district addresses comfort issues energy and high operational cost in nine-year-old K-12 building.

Strasburg-Franklin Local Schools recently completed an energy project with CCG Automation that addressed comfort issues and high energy and operational costs in their nine-year-old K-12 building.  The project included a replacement of the building automation system and numerous mechanical design/installation issues.

Project Highlights:

  • Installation of a new building automation system (BAS).  The new system provided improved controls on the hot and chilled water systems, terminal unit equipment, and primary HVAC equipment and ancillary equipment. 
  • The new BAS allows the school to easily schedule the building by zone promoting energy and maintenance savings.    
  • It also provides advanced trending capabilities to help diagnose and troubleshoot equipment quicker and more effectively allowing the staff to be more efficient and save money.  
  • Occupancy sensors were installed in the gymnasiums to control the existing lighting fixtures in the HS/MS and Elementary Gymnasium.

Success Points:

Cost/ft2
Current            $0.83
Baseline          $2.11

Energy Cost/Year
Current            $  86,395
Baseline          $218,879

Energy Star™ Rating
Current            92
Baseline          8

Btu/Ft ²/Year
Current              45,000
Baseline          128,100

Annual Savings        $132,484

Over the life of the building, Strasbug-Franklin Local Schools will save more than $14.9 million* in utility costs.   *Based on Ohio K-12 schools average.

Building Facts:

  • Type of HVAC System: Variable Air Volume
  • Year Built: Phase I  2007, Phase II  2010
  • Square Footage: 103,693
Energy Star Compliant

 

Project Images



No Images Found.

» Return to Success Stories

Company News

Energy Project of the Year
CCG was recognized by Association of Energy Engineers

Leetonia Exempted Village School See Big Reduction in Energy
Check out the message we just received from Leetonia Exempted Village Schools!

Mechanical Upgrades at St. John Bosco Church


CCG Automation Completes Campus Wide Metering Project at Akron Childrens Hospital


CCG Automation Completes Lighting Upgrades at James A. Garfield Local Schools


Olmsted Falls Middle School Completes Control Upgrades


» View Archived News